Sanyo Denki San Ace Cold Storage Alternative — LONGWELL LWAD3G300

Looking for an alternative for Sanyo Denki San Ace Cold Storage? The LONGWELL LWAD3G300 is the same-size alternative — same control protocol, mounting dimensions on the LONGWELL drawing, performance characterized using AMCA 210/211 test methods (test report on request) — at 40–55% lower landed cost with 15–30 day delivery vs 8–12 weeks ex-works Sanyo Denki. Widely deployed across Japan convenience store cold storage, display case retrofit.

Replaces: Sanyo Denki San Ace Cold Storage Diameter: Ø300 mm Family: San Ace cold chain → LONGWELL LWBE3G / LWAE3G / LWHV / LWFC Sample: 1–3 days
Replacing
Sanyo Denki
San Ace Cold Storage
San Ace cold chain · EC axial fan · Ø300 mm
With
LONGWELL
LWAD3G300
Same size class (Ø300 mm) — mounting per drawing · Same control · 15–30 day delivery

Specification Comparison

Specification Sanyo Denki San Ace Cold Storage LONGWELL LWAD3G300
Fan type EC axial fan EC axial fan
Impeller diameter Ø300 mm Ø300 mm 6 models
Airflow range 900–3,500 m³/h up to 2,524 m³/h
Static pressure (max) 240 Pa up to 185 Pa
Motor power (max) 320 W up to 165 W
Noise floor (Lw) 64 dB(A) from 69 dB(A) (nameplate, per model)
Voltage 200–240 V 1Φ 310 V 1Φ
Control input 0–10 V / PWM / Modbus / EC-Control 0–10 V / PWM / Modbus RTU (RS485)
IP rating IP54 / IP55 IP54 std · IP55 / IP67 option
Certifications CE · UL · VDE · EAC CE · RoHS · REACH · ETL on DC centrifugal / cross flow lines
Sample lead time 4–10 weeks 1–3 days
Series lead time (≤500 units) 8–12 weeks 15–30 days
Landed cost index (LONGWELL = 100) 175–200 100 (baseline)

Matched to Sanyo Denki San Ace Cold Storage by impeller size and fan type — LONGWELL model LWAD3G300 ← San Ace Cold Storage. Confirm the mounting footprint against the dimensioned drawing on the model page.

Why Engineers Switch from San Ace Cold Storage to LWAD3G300

4–8× Faster Delivery

15–30 days
vs 8–12 weeks ex-works for Sanyo Denki in 2026. Sample units 1–3 days from stock vs 4–10 weeks.

40–55% Lower Landed Cost

−€600 to −€2,400
per unit at equivalent spec, depending on size and quantity. On a 50-unit FanGrid retrofit, typical CapEx delta is €30k–€120k.

Drop-in Candidate · Same Size Class

LWAD3G300
Same impeller size and control protocol; confirm the mounting hole pattern and inlet ring against the LONGWELL drawing before ordering.

Drop-in compatibility: what matches and what to confirm

Mechanical match

The LONGWELL LWAD3G300 matches the Sanyo Denki San Ace Cold Storage mounting pattern (M-mount, ISO 9001 plenum-fan footprint) per the mounting dimensions on the LONGWELL drawing. Inlet ring diameter, motor shaft height, and electrical termination box position are identical. In most retrofits no plate modification is needed — confirm the mounting dimensions against the LONGWELL drawing before ordering.

Electrical & control match

The LWAD3G300 accepts the same 0–10 V analog speed reference, PWM (1 kHz), and Modbus RTU (RS485) control signals as Sanyo Denki San Ace Cold Storage. LONGWELL supplies its Modbus RTU register map with the fan so the BMS points can be re-mapped; the register addresses are not identical to the Sanyo Denki map.For ebm-papst-specific bus protocols (EC-Control), ask LONGWELL engineering for the integration options.

Performance match

The measured P-Q curve of every LONGWELL model is on its model page; we check your duty point against it before quoting.

Typical Applications

The LWAD3G300 is widely deployed across Japan convenience store cold storage, display case retrofit. Common application categories include:

  • Japan convenience store
  • Cold display
  • Reach-in cooler

Particularly suited for Japan convenience store cold and frozen display retrofit.

FAQ

Is LONGWELL LWAD3G300 a true drop-in replacement for Sanyo Denki San Ace Cold Storage?
Same size class and control interface. Confirm the mounting hole pattern, inlet ring diameter and shaft height against the dimensioned drawing on the LONGWELL LWAD3G300 model page before ordering; it accepts the same 0–10 V analog / PWM / Modbus RTU control signals and is offered in the voltages listed in the table above.
How does LWAD3G300 compare on efficiency to San Ace Cold Storage?
LONGWELL does not publish a single peak-efficiency figure for the LWAD3G300. The model page on the selection site gives airflow, static pressure and input power along the curve (measured where marked, nameplate-estimated otherwise), so the efficiency at your duty point follows directly; a test report for a specific model is available from engineering on request.
What’s the 2026 lead time difference?
As of May 2026: Sanyo Denki San Ace Cold Storage requires 8–12 weeks ex-works due to ongoing allocation. LONGWELL LWAD3G300 ships in 15–30 days for orders up to 500 units and 6–10 weeks for 1,000+ unit OEM programs. Sample units ship in 1–3 days from stocked Ø300 mm inventory.
What’s the cost delta?
At equivalent specification (same Ø, same airflow/Pa, same IP, same control), LONGWELL LWAD3G300 typically lands at 40–55% below Sanyo Denki San Ace Cold Storage ex-works pricing. Final pricing depends on quantity, voltage, IP rating, and control protocol options.
What applications is LWAD3G300 typically used for?
LWAD3G300 is widely deployed across Japan convenience store cold storage, display case retrofit. Particularly suited for Japan convenience store cold and frozen display retrofit.

Replace your San Ace Cold Storage — samples in 1–3 days

Send a quick request — model + quantity + delivery address. Sample unit ships in 1–3 days for field validation. Series production at 15–30 day lead time after PO.

Request Sample View Full Cross-Reference Table
Official Product Page
Browse the full EC Axial Fans range on longwellfans.com — request a quote on LWAD3G300 directly.
View on longwellfans.com →
Sanyo Denki® is a trademark of its owner. LONGWELL is an independent manufacturer and is not affiliated with, endorsed by, or sponsored by Sanyo Denki. This page is published as engineering reference based on public datasheets. All performance figures reflect specific test conditions; final selection should be confirmed by duty point, voltage/control, mounting and project validation.