Renewable Energy · Solution Pack · EN V1.0

Renewable Energy Cooling
One-Stop Fan Platform

From the PV inverter to the BESS container to the 350 kW charger: EC axial fans to Ø1000 mm, backward-curved EC centrifugal to the 1,800 Pa class, and ATEX-certified emergency exhaust — with the 0-10 V / PWM / Modbus RTU / BACnet MS-TP interfaces, IP55–IP66 housings and −25 °C cold start that outdoor energy equipment requires.

Ø 200–1000 mm
EC AXIAL PLATFORM SPAN
LWAE3G · 13 impeller diameters
1,658 Pa
MAX STATIC, 280 mm FRAME
LWBE3G280-102PS-04 · PV inverter duty
−25 to +60 °C
QUALIFIED ENVELOPE
wind cabinet + inverter station duty
20,000
ATEX + HP FANS PER YEAR
battery dust-collection programme
Why LONGWELL

Why LONGWELL for Renewable Energy Equipment

Energy hardware is bought on three numbers the buyer cannot inspect: years of unattended service, watts lost per year, and whether the fan survives the enclosure. We build the platform around those three — plus the certification scope that decides whether the equipment can be sold at all.

01
ONE ROTOR FAMILY

Ø200–1000 mm, 13 Diameters

One EC axial platform covers the whole renewable stack: Ø200–300 for charger cabinets, Ø300–450 for PV inverters and BESS containers, Ø450–1000 for nacelle and container heat rejection. Shared register map means one integration effort per OEM, not per product.

LWAE3G-200 → LWAE3G-1000 · 800–32,000 m³/h · 30–2,200 W
02
IP66 + ATEX IIIC

Sealed Outside, Certified Inside

Inverter housings sit outdoors for 20 years; BESS containers can hold combustible dust and vented gas. IP44 through IP68 variants to IEC 60529, and ATEX II 3D Ex tc T125 °C IIIC scope for dust zones and container emergency exhaust.

IP44 / IP54 / IP55 / IP66 / IP68 · IEC 60529 · IEC 60079-31
03
DUAL CONTROL INTERFACE

0–10 VDC and 4–20 mA on One Fan

Wind and utility buyers specify both signals on the same unit — and want it printed on the datasheet and the schematic, because a mismatch triggers a repeat witnessed test. Modbus RTU, RS485, BACnet MS-TP and CANopen optional across the EC platforms.

0-10 V + 4-20 mA + Modbus RTU · PF > 0.95 · 12 protections
04
BIOMIMETIC EC EFFICIENCY

Part Load Is the Whole Bill

BESS and inverter cooling runs at part load almost all year — energy shifting, night-time EV charging, low-irradiance mornings. LWBE3G bionic impellers cut 4–6 dB(A), halve high-frequency noise and save 8–12% energy with +25–30% stall margin.

Static efficiency 73–82% · ≤1,800 Pa · L10 60,000 h @ 40 °C
05
HIGH-STATIC CEILING

Where Normal Plug Fans Starve

Dense filter faces, radiator cores and long container ducts push duty past the 1,800 Pa envelope. High-pressure variants hold 3.2 kPa at the cartridge face and 1,658 Pa from a 280 mm frame — with curves measured per part number, not interpolated.

3.2 kPa ATEX HP class · 1,658 Pa @ Ø280 · AMCA 210 / ISO 5801
What's Inside

What's Inside This Pack

Six sections, written the way an energy-equipment engineer buys: duty first, part numbers second, honest boundaries third.

Pack at a glance

  • Application segments6
  • Product platforms mapped3
  • Certifications held11
  • Segment deep dives4
  • Reference cases1 documented + 1 composite
  • Case evidence base10 project threads · 2020–2024
  1. §16 Renewable Energy Segments
    PV inverter, BESS, EV charging, wind, power plants & fuel cells, DAC
  2. §2Product × Application Matrix
    3 platforms, 10 duty points, model numbers included
  3. §3Segment Deep Dives
    Challenges + recommended configurations
  4. §42026–2030 Trend Radar
    Sourced IEA data: BESS, charging, DAC, duty cycles
  5. §5Certifications & T1 Test Library
    What we hold, what we do per project, what is not in scope
  6. §6Reference Cases
    Wind + PV witness-tested programme · ATEX battery dust programme
Fastest path. Sizing a container or cabinet fan → deep dive: BESS, then the platform matrix in §2. Replacing an incumbent inverter fan → PV inverter dive and the retrofit duty point at §6. Writing an investment or sourcing case → §4 has the IEA-sourced numbers.
§1 · Application Architecture

6 Renewable Energy Segments, One Platform Logic

Each segment differs in static pressure, duty cycle, ingress protection and certification scope — but they share the same EC motor and control layer, which is what makes a single-supplier BOM practical across a product portfolio.

P

PV & String Inverter Cooling

External fan over the heatsink on a closed IP66 housing, plus internal circulation and hotspot cooling on central inverters. Ambient can hit 60 °C on a roof or in a container station.

LWAE3G Ø300/350/400 · LWBE3G280 retrofit · LWBE3G310
B

BESS Container & Battery Cabinet

Container-level ventilation, cabinet-level circulation around LFP modules, liquid-cooling heat-exchanger airflow and fire-gas emergency exhaust. BMS-linked control, 20-year design life.

LWAE3G Ø350/400/450 · LWBE3G310 · REM ATEX EC
E

EV Fast-Charging Cabinets

Sealed power-electronics cabinets at 200–600 kW, plus liquid-cooled cable circuits where the radiator sits behind an EC centrifugal. Noise matters at residential and retail sites.

LWAE3G Ø200/250/300 · LWBE3G310 radiator
W

Wind Turbine Cabinets & Nacelle

Converter and control cabinets in the tower base or nacelle: vibration, salt-laden air, −25 °C cold start, and maintenance windows measured in months — reliability outranks peak efficiency.

LWBE3G450-138PT-12 · LWAE3G large frames
G

Power Plants, Fuel Cells & Bio-energy

Generator and transformer cooling, machine-room ventilation, combustion air and emergency cooling circuits — duty that must run when everything else has failed.

LWAE3G · LWBE3G · LWCA cross-flow
D

Direct Air Capture & Carbon Removal

Contactor airflow at very large volume against a high pressure drop — fan electricity is the dominant operating cost per tonne of CO₂ captured, so efficiency and controllability decide the business case.

LWAE3G large frames · LWBE3G high-static
§2 · Platform Mapping

3 Platforms × Renewable Energy Duty

Three released platforms cover the whole page. Where a platform is offered in several frames, the frame list is the quote list.

LWAE3G Series
EC Axial · Ø200–1000 mm · 13 Sizes
  • Airflow 800–32,000 m³/h · static 90–400 Pa · power 30–2,200 W · IE4+
  • Efficiency 85–92% · noise 32–65 dB(A) · L10 60,000 h @ 40 °C
  • 0-10 V / PWM / Modbus RTU / BACnet MS-TP · CANopen optional
  • PV inverter: Ø300 / 350 / 400 — IP66, Modbus RTU, 25-year design-life target
  • BESS container: Ø350 / 400 / 450 — ATEX variant option, BMS interlock
  • EV charger cabinet: Ø200 / 250 / 300 — IP55 / IP66
  • Frame list: LWAE3G-200, -250, -300, -315, -350, -400, -450, -500, -560, -630, -710, -800, -1000
LWBE3G Series
EC Backward-Curved Centrifugal · 12 Sizes
  • Ø190–710 mm · 500–30,000 m³/h · ≤1,800 Pa · 130 W–7.2 kW
  • Bionic impeller: −4–6 dB(A), −50 %+ HF noise, −8–12 % energy, stall margin +25–30 %
  • Static efficiency 73–82% · L10 60,000 h @ 40 °C
  • BESS cabinet circulation: LWBE3G310-102NS-29 (variants -18 / -19 / -20 / -21)
  • PV inverter retrofit: LWBE3G280-102PS-04 — 230 V, 700 W, 3,270 rpm, 3,863 m³/h, 1,658 Pa max, IP55
  • Wind cabinet: LWBE3G450-138PT-12 — 380 VAC, 1,250 W, 8,755 m³/h @ 845 Pa, dual 0-10 V + 4-20 mA
REM ATEX EC
Explosion-Protected Centrifugal · Ø400–560
  • Models REM 400 / 450 / 500 / 560 ATEX EC
  • Scope ATEX II 3D Ex tc T125 °C IIIC per IEC 60079-31 — certificate per shipment, not a one-time type test
  • BESS emergency exhaust: the mainstream 250–500 kW container configuration uses REM 450
  • Anti-static impeller, spark-resistant housing, electrically grounded shaft
  • Gas-group variants are project-specific — send the zone, dust group and gas group and we confirm the scope
  • Same certified platform used in the battery cathode dust programme (see §6)
§3 · Segment Deep Dives

Four Segments, Requirement by Requirement

The three things that actually go wrong in each segment, and the configuration that answers them.

PV & String Inverter Cooling

Closed housing, heatsink on the outside, ambient up to 60 °C. Every degree inside the enclosure costs usable watts — and the fan is the only part expected to last the plant's life.

01

Temperature derating is silent revenue loss

Inverter output falls as internal temperature rises. A fan that loses 15% airflow to a clogged intake in year three quietly costs more than the fan did.

02

The fan lives outdoors, the electronics do not

IP66 on the external path, UV-stable housing, and a bearing system rated for continuous duty at 60 °C ambient — not the 40 °C laboratory condition.

03

Plant life vs fan life

PV plants are financed over 25 years. Fans are often the first component to be replaced; L10 at 40 °C and an accessible replacement envelope are part of the electrical design.

RequirementRecommended configurationWhy
External heatsink fan, string / central inverterLWAE3G EC axial Ø300 / 350 / 400, IP66, Modbus RTUSealed external path; speed follows the inverter's own temperature signal instead of a fixed thermostat
Retrofit into an existing inverter stationLWBE3G280-102PS-04 — 3,863 m³/h, 1,658 Pa max, IP55, 0-10 V / PWM / RS485The incumbent's pressure curve is the binding spec; airflow alone will starve the heatsink
Internal circulation / hotspotLWBE3G compact Ø190–280 centrifugalMoves air across the enclosure instead of recirculating a hot pocket over the IGBTs
Cold-climate start−25 °C cold-start T1 report on requestNorthern-array mornings start below freezing with the electronics already at ambient
Service in year 8Documented replacement envelope + connector layoutRetrofit time on a rooftop or in a container is a labour cost, not a fan cost

P-Q curves are issued per part number from the AMCA 210 / ISO 5801 bench. Send the enclosure drawing and the heatsink ΔP and we return the curve at your operating point.

BESS Container: Thermal Management & Fire Safety

One container has two airflow jobs that are usually specified by different people: keeping LFP modules in their temperature window, and emptying the container of flammable gas before it becomes an explosion.

01

Temperature spread shortens pack life

Cell-to-cell ΔT drives uneven ageing; a container that is cool on average but stratified still loses capacity in the hot zone first.

02

Gas accumulation is the real hazard

Fire codes treat vented flammable gas as an explosion risk, not a smoke problem. Emergency exhaust must be rated for the zone it sits in.

03

Daily cycling for 20 years

Energy-shifting duty means continuous part-load operation, not peak design point. Bearing life and part-load efficiency decide the 20-year cost.

RequirementRecommended configurationWhy
Container ventilation / heat rejectionLWAE3G EC axial Ø350 / 400 / 450, IP55, ATEX variant optionBMS-driven speed control; 450 mm is the mainstream frame for 250–500 kW containers
Cabinet / module-row circulationLWBE3G310-102NS-29 (-18 / -19 / -20 / -21)Ducted internal paths need static pressure; centrifugal holds flow as filters load
Liquid-cooling heat exchangerLWBE3G high-static or LWHV high-pressure classRadiator cores and dense fins are a pressure problem first, an airflow problem second
Emergency exhaust — fire gasREM 400 / 450 / 500 / 560 ATEX EC, II 3D Ex tc T125 °C IIICExplosion-protected, certificate per shipment; REM 450 is the standard 250–500 kW container fit
Control & interlockModbus RTU / RS485 to the BMS, 12 built-in protectionsThe BMS should see fan status, not just a contactor; alarms must precede a temperature trip
Winter / commissioning−25 °C cold-start report; IP55 for coastal containersCold commissioning happens before the heating circuit is proven

EV Fast-Charging Cabinets

A 350–600 kW charger converts 5–8% of its throughput into heat inside a sealed cabinet: 20–45 kW that has to leave through a filtered intake, a radiator, or both.

01

Duty is spiky, not steady

Full power for 20 minutes, then idle. The fan must ramp with the power modules, and idle quietly at a retail or residential site.

02

Two heat paths, two fan types

Air path through the cabinet and liquid path through a cable/radiator circuit. One needs volume at low static, the other needs static through a core.

03

Filters load, output drops

An intake filter that doubles its resistance after a season moves the operating point up the curve — select on the dirty-filter duty, not the clean one.

RequirementRecommended configurationWhy
Cabinet inlet / exhaust 200–350 kWLWAE3G Ø200 / 250 / 300, IP55, 0-10 V / PWMCompact frames fit the enclosure wall without a plenum; PWM keeps cabinet pressure stable
350–600 kW liquid-cooled circuitLWBE3G310 high-static on the radiatorThe radiator core is the pressure drop; the fan has to be selected at the core's curve
Night noise at residential sitesBionic impeller (LWBE3G) + ≤1,800 Pa duty−4–6 dB(A) and −50 % HF noise is the difference between a permit and a complaint
Coastal / high-dust sitesIP66 variant + coated housingSalt fog and brake dust both attack the impeller edge first
Multi-bay cabinetsOne register map across Ø200–300 framesA 6-bay site integrates once, not six times

Wind Turbine Cabinets & Converter Cooling

Every service visit costs more than the fan. Converters and control cabinets in the tower base or nacelle must run unattended through vibration, salt air and −25 °C starts.

01

Maintenance dominates total cost

A fan failure that needs a nacelle visit can cost more than the unit several times over. Reliability is the specification; efficiency is the bonus.

02

Two control signals, one fan

Wind cabinets routinely specify 0–10 VDC and 4–20 mA on the same unit. If it is not printed on the datasheet and the schematic, expect a repeat witnessed test.

03

Vibration, corrosion, cold

Brackets are audited like machined parts: material grade, welding detail, hole positions, tolerances — and the assembly video that proves them.

RequirementRecommended configurationWhy
Converter / control cabinet fanLWBE3G450-138PT-12 — 8,755 m³/h @ 845 Pa, dual 0-10 VDC + 4-20 mA, IP54, Class FDuty proven in wind cabinets; both interfaces stated on the datasheet
Nacelle ventilation / heat rejectionLWAE3G large frames Ø450–1000High volume at modest static, with speed control tied to gearbox and generator temperatures
Witnessed factory testDynamic balance ≤1.0 g/side · vibration ≤3.5 mm/s · withstand 2,100 V / 1 s · video recordThe test procedure is agreed before sampling — that is what a witnessed test actually means
Bracket as an engineered partFull manufacturing drawing + assembly videoMaterial grade, weld detail, hole positions and surface finish, all dimensioned
Series securityReserve line capacity + stated warranty before awardProgrammes have asked for 1,000 pcs/month reserved; we put it in writing
§5 · Evidence Layer

Certifications & T1 Test Report Library

What we hold today, what is done per project, and — explicitly — what is not yet in scope.

Certifications held today

CEEMC EN 55014-1/-2 Class BLVD 2014/35/EUUL 1004-1 + UL 507ETLFCC Part 15 Class BCCCRoHS / REACHErP Tier 2ISO 9001 / 14001 / 45001ATEX II 3D Ex tc T125 °C IIIC

IP variants across the EC platforms: IP44 / IP54 / IP55 / IP66 / IP68, verified to IEC 60529. ATEX scope per IEC 60079-31, certificate issued per shipment — not a one-time type test.

T1 reports — issued within 1 working day

  • AMCA 210-16 / ISO 5801 — P-Q curves (the baseline document for inverter, container and charger duty-point selection)
  • ISO 3744 / ISO 13347 acoustics · ISO 14694 / ISO 10816 vibration
  • ISO 281 — L10 life (basis of the 60,000 h @ 40 °C claim)
  • IEC 60529 IP · −25 °C cold start · dynamic balance ≤1.0 g/side · withstand 2,100 V / 1 s
  • ATEX IEC 60079-31 declaration + NFPA 652-aligned compliance statement, per bill of lading
  • Not yet in scope IEC 62933-5-2 (BESS safety) · UL 9540A cell-level propagation · IEC 61400-1 / DNV (wind) · UL 1741 SB (inverter) · ISO 9227 salt spray 96 h — flagged rather than implied
§6 · Reference Case · Wind & PV

Wind Cabinets & PV Inverter Stations · 10 Project Threads

A documented programme, not a composite: correspondence dated 11 November 2020 – 3 January 2024, across wind turbine manufacturers, PV plant operators and solar process-equipment builders in India, the Philippines and Germany.

DOCUMENTED PROGRAMME · WIND + PV

8,755 m³/h at 845 Pa, with the bracket audited like a machined part

Programme scope10 documented project threads · wind cabinets, PV inverters, solar thermal process equipment
Correspondence11 Nov 2020 – 3 Jan 2024 · last compiled 1 Sep 2026
GeographyIndia · Philippines · Germany
Renewable energy buyers behave like heavy-industry buyers: they witness the factory test, they audit the bracket drawing as closely as the fan, and they want a stated reserve capacity before they place a series order. Programme framing · wind & PV inverter cooling segment

1 · Challenge

  • Testing is witnessed, not reported. One manufacturer required speed, current, input power, insulation withstand and vibration — with a test report and a video, and line-by-line alignment on the test procedure itself.
  • Two control signals, not one. Wind cabinets specified 0–10 VDC and 4–20 mA on the same fan, printed on the datasheet and the schematic, or it triggers a repeat test.
  • The bracket is audited like a machined part. Material grade, welding detail, tube dimensions, hole positions, surface finish and tolerances on the drawing, plus an assembly video.
  • Reserve capacity is part of the offer. One programme asked for a committed 1,000 pcs/month reserve line plus a one-year warranty before series award.
  • Inverter cooling is a high-pressure retrofit. PV inverter and container-station replacements must match the incumbent's pressure curve, not just its airflow, and hold IP55 outdoors.

2 · Solution architecture & bill of materials

EC backward-curved fans with dual 0–10 VDC and 4–20 mA control, inlet ring and bracket structures manufactured to a fully dimensioned drawing, and a factory test regime run to a procedure agreed with the customer in advance — dynamic balance, high-voltage withstand and vibration limits, recorded on video. Aerodynamic figures are tested per AMCA 210/211 methods so the customer can reconcile them against their own system calculation.

LONGWELL SKURatingsApplication
LWBE3G450-138PT-12380 VAC (304–456 V), 50/60 Hz, 1,700 rpm, 1,250 W, 2.15 A, 8,755 m³/h (5,211 CFM), 845 Pa, 81 dB(A), dual 0–10 VDC + 4–20 mA, IP54, Class F (155 °C), −25 to +60 °C, inlet ring + bracketWind turbine control and converter cabinets
LWBE3G280-102PS-04230 V, 50/60 Hz, 700 W, 3.1 A, 3,270 rpm, 3,863 m³/h, up to 1,658 Pa max static, 85 dB(A), 0-10 V / PWM / RS485, over-temp / over-current / stall protection, IP55PV inverters and container inverter stations
LWCA090-500220 V, 50/60 Hz, 250 W, 2,500 rpm, 1,400 m³/h, 73 dB(A), −20 to +70 °C, insulation B/F/H, CESolar PV thermal process equipment

3 · Verified figures

8,755 m³/h
Wind cabinet duty @ 845 Pa (LWBE3G450-138PT-12)
0–10 V + 4–20 mA
Both interfaces on one fan, on the datasheet
≤1.0 g
Residual dynamic balance per side, every unit
≤3.5 mm/s
Vibration limit agreed as a factory test criterion
2,100 V / 1 s
Withstand voltage test, part of the agreed procedure
1,000 pcs/mo
Reserve line capacity committed before series award

Fan performance figures are quoted from LONGWELL controlled datasheets and product nameplates and tested per AMCA 210/211 methods; third-party reports available on request. Customer names, commercial terms and pricing are withheld; model numbers, ratings and dimensions are quoted as delivered.

4 · How the programme runs

StageWhat happened
Duty & interfaceAirflow, static pressure and both control interfaces (0–10 VDC and 4–20 mA) agreed and marked on the datasheet and schematic before sampling
Test procedureWitness format (on site, video or live) and test schedule agreed in advance, with fan-level and system-level items separated explicitly
Bracket drawingFull manufacturing drawing with tolerances, material grade, welding detail, hole positions and surface finish, plus an assembly guidance video
Factory testDynamic balance ≤1.0 g per side, speed, power, withstand voltage 2,100 V / 1 s and vibration ≤3.5 mm/s, recorded on video for the customer to review
Capacity & warrantyReserve line capacity and warranty terms stated in writing before series award
Series supplySamples go into the customer's own equipment for in-situ verification before the ramp

5 · Engineering lessons

  • Agree the witness format and schedule before sampling. Whether the customer attends, watches a video or joins a live stream changes the whole test plan, and settling it late delays the award.
  • Draw the boundary between fan-level and system-level testing explicitly. Most disputes in renewable programmes are about which test proves what, not about the fan.
  • Quote both control interfaces as a datasheet line item. 0–10 VDC and 4–20 mA on one unit is a specification, not an option — and it has to appear where the schematic is drawn.
  • Treat the bracket as a delivered engineering document. A drawing with tolerances plus an assembly video removes the second-round mechanical questions.
  • On inverter retrofits, ask for the incumbent's pressure curve. Matching airflow alone is the single most common cause of an under-cooled heatsink after a "successful" replacement.

Case source: longwellfans.com · use case: wind-solar-and-inverter-equipment-cooling

COMPOSITE REFERENCE CASE · ATEX

Battery cathode dust collection · gigafactory ATEX IIIC

Programme shape12,000 ATEX plug + 5,000 high-pressure + 3,000 workspace fans per year
Reference periodComposite reference · 2025–2026 deployment pattern
GeographyAsia-Pacific battery gigafactory segment
NMC cathode powder is combustible and electrically conductive — the most aggressive dust group. A fan certified for grain dust is not certified for this. Engineering framing · battery cathode dust segment

1 · Challenge

  • ATEX II 3D Ex tc T125 °C IIIC required for collector-interior fans in zone 21 — IIIB (grain) or IIIA (sugar) scope is not sufficient.
  • Dense cartridge filter media needs 1,500–3,000 Pa at the fan — past the envelope of a standard plug fan.
  • Gigafactory ramp rates demand sustained volume, not prototype batches; compliance documentation has to travel with every shipment.

2 · Bill of materials

LONGWELL SKUTypeQtyKey spec
LWBE3G-ATEX-IIICATEX EC plug fan12,000 / yrØ355–560 · II 3D Ex tc T125 °C IIIC · grounded impeller + shaft per IEC 60079-31 · 87% η peak
LWHV-ATEX-450-HPATEX high-pressure plug fan5,000 / yrØ450 · 3.2 kPa static · IIIC · anti-static + spark-resistant housing
LWAE3G-ATEX-630ATEX workspace axial3,000 / yrØ630 · IIIC · zone-22 clear-air ventilation for the cathode workspace

3 · Modelled outcomes — typical range

IIIC
Full combustible conductive dust scope
3.2 kPa
Static pressure at the dense cartridge face
20,000
ATEX + high-pressure + workspace fans per year
0
ATEX-related incidents in 2-yr field service
6 weeks
Lead time, first batch
1,700/mo
Series cadence at month 3

How to read these figures: this is an anonymised composite reference case — the volumes and operating pattern are representative of the segment, not a specific named customer claim. Real references are available under NDA on project qualification.

4 · Engineering lessons

  • Dust group IIIC is a different specification from IIIB, not an administrative upgrade. Electrostatic discharge, not just ignition temperature, drives the impeller and grounding design.
  • The high-static fan is not a bigger version of the standard plug fan — at 3.2 kPa the wheel, the housing and the motor thermal margin all change.
  • The ATEX certificate must ship with the goods. Permit-issuing authorities accept a per-shipment certificate; a one-time type test is not a substitute.
  • Zone-22 workspace ventilation is routinely left out of the dust-collector OEM specification, and then has to be retrofitted after the first safety audit.

Case source: longwellfans.com · use case: industrial-dust-atex-battery-cathode

How We Work

From Duty Point to Released Part Number

Four steps, no mystery: you send the duty, we send the hardware documentation, you verify on your own bench.

1

Send the duty point

Airflow (m³/h or CFM), static pressure (Pa or in. wg), supply voltage, control interface, ambient range and IP requirement — plus the enclosure or container drawing if you have one.

2

We answer with hardware

A model, a measured P-Q curve (AMCA 210 / ISO 5801), an installation drawing and the documents that belong to that part number — within the week for standard frames.

3

Sample & witness test

Stocked sizes ship samples in 1–3 days. Factory test per the procedure agreed with you — balance, withstand, vibration — recorded on video or witnessed live.

4

Series supply

MOQ 100–500 pcs by size · production lead 15–30 days · reserve line capacity stated in writing · warranty 12 months (extendable 18–24 by agreement).

Engagement Paths

Four Ways In

Pick the path that matches your project stage — each one starts with a document you already have.

A
PV INVERTER OEM

Inverter & Combiner Manufacturer

Send the enclosure drawing, heatsink ΔP and the temperature signal you control on. We map LWAE3G Ø300–400 external fans plus internal circulation, with the curve at your operating point.
Needs: enclosure drawing + heatsink ΔP
B
BESS INTEGRATOR & EPC

Container Integrator or Storage EPC

Send the container thermal model, BMS protocol and the fire-safety concept. We size ventilation, cabinet circulation and REM ATEX emergency exhaust as one BOM with one Modbus map.
Needs: thermal model + BMS protocol + zone classification
C
EV CHARGER OEM

Charger & Power-Module Manufacturer

Send the cabinet loss budget and the liquid-cooling circuit layout. We select cabinet fans on dirty-filter duty and radiator fans on core pressure drop — not on clean-catalogue airflow.
Needs: loss budget + filter spec + noise limit
D
REPLACEMENT & RETROFIT

Incumbent Fan Replacement

Send the incumbent part number (any brand) and the duty point. We return the LONGWELL counterpart with measured curves — or tell you honestly if the duty sits outside our released range.
Needs: incumbent SKU + duty point
Contacts

Renewable Energy Sales Contacts

General Salessales@longwellfans.comQuotations, MOQ, lead times, samples
Online Fan Selectorselect.longwellfans.comSelf-serve platform selection, then send us the duty point

Send us the duty point. We answer with a model, a curve, a drawing and the documents.

What to send for a same-week answer:

  • Airflow and static pressure at the design duty point (m³/h + Pa, or CFM + in. wg)
  • Supply voltage and control interface (0-10 V / 4-20 mA / PWM / Modbus RTU / RS485)
  • Environment: ambient range, IP requirement, coastal / dust / ATEX zone classification
  • Application: inverter heatsink / BESS container / charger cabinet / nacelle converter
  • If replacing an incumbent: the current part number (any brand) and its pressure curve
  • Target certifications and destination market (EU / NA / APAC) plus witness-test expectations
Email LONGWELL Team Open the Fan Selector
NINGBO LONGWELL ELECTRIC · Fans & motors since 1990 · Ningbo, China · exported to 30+ countries longwellfans.com · Renewable Energy Solution Pack EN V1.0