ebm-papst RadiPac 400 Alternative — LONGWELL LWBE3G-400-RDP

Looking for an alternative for ebm-papst RadiPac 400? The LONGWELL LWBE3G-400-RDP is the dimensionally interchangeable equivalent — same mounting, same control protocol, AMCA 210/211 third-party-tested performance — at 40–55% lower landed cost with 15-day delivery vs 16–22 weeks ex-works ebm-papst. Widely deployed across Active RDHx modules, CDU heat reject, L2A 40–70 kW/rack.

Replaces: ebm-papst RadiPac 400 Diameter: Ø400 mm Family: RadiPac pre-assembled → LONGWELL LWBE3G / LWAE3G / LWHV / LWFC Sample: 1–3 days
Replacing
ebm-papst
RadiPac 400
RadiPac pre-assembled · EC plug fan pre-assembled FFU module · Ø400 mm
With
LONGWELL
LWBE3G-400-RDP
Drop-in dimensional match · Same control · 15-day delivery

Specification Comparison

Specificationebm-papst RadiPac 400LONGWELL LWBE3G-400-RDP
Fan typeEC plug fan pre-assembled FFU moduleEC plug fan pre-assembled FFU module
Impeller diameterØ400 mmØ400 mm Drop-in
Airflow range1,000–5,800 m³/h1,000–5,800 m³/h
Static pressure (max)1400 Pa1400 Pa
Motor power (max)1,500 W1,500 W
Wire-to-air η peak (AMCA 210)90%88%
Noise floor (Lw)70 dB(A)73 dB(A)
Voltage380–480 V 3Φ380–480 V 3Φ
Control input0–10 V / PWM / Modbus / EC-Control0–10 V / PWM / Modbus RTU / Modbus TCP Compatible
IP ratingIP54 / IP55IP54 std · IP55 / IP67 option
CertificationsCE · UL · VDE · EACCE · UL · cUL · TÜV · ATEX · VDE · EAC · RoHS · REACH
Sample lead time4–10 weeks1–3 days
Series lead time (≤500 units)16–22 weeks15–30 days
Landed cost index (LONGWELL = 100)175–200100 (baseline)

Why Engineers Switch from RadiPac 400 to LWBE3G-400-RDP

4–8× Faster Delivery

15–30 days
vs 16–22 weeks ex-works for ebm-papst in 2026 (active allocation). Sample units 1–3 days from stock vs 4–10 weeks.

40–55% Lower Landed Cost

−€600 to −€2,400
per unit at equivalent spec, depending on size and quantity. On a 50-unit FanGrid retrofit, typical CapEx delta is €30k–€120k.

True Drop-In Compatibility

±0.5 mm
mounting hole tolerance + identical control protocol. Installation time same as same-brand replacement.

Drop-In Compatibility Details

Mechanical match

The LONGWELL LWBE3G-400-RDP matches the ebm-papst RadiPac 400 mounting pattern (M-mount, ISO 9001 plenum-fan footprint) within ±0.5 mm tolerance. Inlet ring diameter, motor shaft height, and electrical termination box position are identical. Drop-in retrofit requires no AHU rework, no plate modification, and no plenum hole resizing.

Electrical & control match

The LWBE3G-400-RDP accepts the same 0–10 V analog speed reference, PWM (1 kHz), and Modbus RTU (RS485) control signals as ebm-papst RadiPac 400. Default Modbus register map is compatible with the ebm-papst ecosystem; LONGWELL provides a free Modbus map cross-reference for BMS integration. ebm-papst-specific proprietary protocols (EC-Control bus / ZA-control) are bridged via a free MODBUS gateway available from LONGWELL Engineering — no BMS reprogramming required.

Performance match

The PQ curve of LONGWELL LWBE3G-400-RDP sits within 2–3% of the ebm-papst RadiPac 400 curve across the full operating envelope (verified by third-party AMCA 210/211 testing at TÜV and Intertek labs). Wire-to-air efficiency at BEP is 88% vs 90% for ebm-papst (2 pp delta at peak). In typical part-load HVAC duty, the gap narrows to within 1 pp.

Typical Applications

The LWBE3G-400-RDP is widely deployed across Active RDHx modules, CDU heat reject, L2A 40–70 kW/rack. Common application categories include:

  • L2A 40–70 kW/rack
  • Active RDHx
  • CDU heat reject

Particularly suited for active RDHx and CDU heat-reject for 40–70 kW/rack AI deployments.

FAQ

Is LONGWELL LWBE3G-400-RDP a true drop-in replacement for ebm-papst RadiPac 400?
Yes. The LWBE3G-400-RDP matches the RadiPac 400 dimensionally (mounting hole pattern, inlet ring diameter, motor shaft height) within ±0.5 mm tolerance, accepts the same 0–10 V analog / PWM / Modbus RTU control signals, and operates from the same 380–480 V 3Φ supply. Installation time and AHU integration are identical to a same-brand replacement.
How does LWBE3G-400-RDP compare on efficiency to RadiPac 400?
ebm-papst RadiPac 400 delivers 90% peak wire-to-air efficiency at BEP. LONGWELL LWBE3G-400-RDP measures 88% in AMCA 210/211 third-party testing — a 2 pp difference at peak. In typical part-load HVAC duty (30–80% of design airflow), the gap narrows to within 1 pp because both platforms hold flat η curves across their operating range.
What's the 2026 lead time difference?
As of May 2026: ebm-papst RadiPac 400 requires 16–22 weeks ex-works due to ongoing allocation. LONGWELL LWBE3G-400-RDP ships in 15–30 days for orders up to 500 units and 6–10 weeks for 1,000+ unit OEM programs. Sample units ship in 1–3 days from stocked Ø400 mm inventory.
What's the cost delta?
At equivalent specification (same Ø, same airflow/Pa, same IP, same control), LONGWELL LWBE3G-400-RDP typically lands at 40–55% below ebm-papst RadiPac 400 ex-works pricing. Final pricing depends on quantity, voltage, IP rating, and control protocol options.
What applications is LWBE3G-400-RDP typically used for?
LWBE3G-400-RDP is widely deployed across Active RDHx modules, CDU heat reject, L2A 40–70 kW/rack. Particularly suited for active RDHx and CDU heat-reject for 40–70 kW/rack AI deployments.

Replace your RadiPac 400 in 5 days

Send a quick request — model + quantity + delivery address. Sample unit ships in 1–3 days for field validation. Series production at 15-day lead time after PO.

Request Sample View Full Cross-Reference Table
Official Product Page
Browse the full FFU Fans & Motors range on longwellfans.com — request a quote on LWBE3G-400-RDP directly.
View on longwellfans.com →
ebm-papst® and RadiPac® are registered trademarks of ebm-papst Group. LONGWELL is an independent manufacturer and is not affiliated with, endorsed by, or sponsored by ebm-papst. Any references to third-party trademarks are used solely for identification and comparison purposes.